Description
- Local person who will perform dimension control verification at Navantia site in Càdiz, Spain (work load 50%)

Qualifications
- Must speak and write English. And should be able to speak Spanish.
- The following is written in Norsok standard M-101, E.4.3: Personnel responsible for dimensional control activities shall have a minimum background of at least 5 years relevant experience in industrial surveying.
- The same requirements should apply to our person who will carry out dimension control verifications.
- Must have available the following equipment and pc software:
- Total Station for surveying / collection of as-built data on structure. And in addition surveying targets that fit for industrial surveying.
- PC software for calculations.
- PC software for reporting. We will recommend Microstation
- Must be able to perform analysis of data in relation to geometric product specifications. Norsok M-101, annex E is central, but other standards can also be used as well.

Duration 10.06.2019 - 03.01.2020 (work load: 50%)
Location Navantia, Cadiz

Visit Inside Omega to browse the unique advantages available to our team. InsideOmega.com